Pumping line at Villoria´s pumping station. Salamanca. Spain

Project

NEW PUMPING LINE AT VILLORIA’S PUMPING STATION (SALAMANCA, SPAIN)

Client

CONFEDERACIÓN HIDROGRÁFICA DEL DUERO

Start date

2017

Finish date 

2018

The project consists of the extension of the Villoria’s Pumping Station (Salamanca, Spain) based on the installation of a third pumping line.

The main actions to be carried out are:

  • Execution of civil works: supports for the new pumping line, foundations and pipelines for the extension of the electric substation
  • Supply and installation of the pressure pipe (1.4 m diameter)
  • Installation, testing and commissioning of a new pump (flow rate 5m³/sec)
  • Extension of the existing electrical substation, through the supply, installation, testing and commissioning of power transformer 30 MVA, 45/10 kV, current transformers, voltage transformers, automatic switches, current disconnectors and power cabling
  • Extension of the 10 kV busbar, with the supply and assembly of new switchgear
  • Modernization of the plant control system